img(height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=2939831959404383&ev=PageView&noscript=1")

The Golden Thread from the Hackitt Review to the RIBA Plan of Work The Building

Please find below the presentations from the RIBAJ & HILTI firestop conference, held on the 19th November.

Fire design specification – getting it right

Top 10 design specification concerns for professionals on controlling the spread of fire

Judith Schulz, Associate Director, ARUP

Case Study: From concept to deliver

Neal Morgan-Collins, Director and Mario Vieira, Project Director, Design Delivery Unit (a Scott Brownrigg Company)

RIBA Plan of Work for Fire Safety

Best practice process map for embedding fire safety in building design, procurement, construction and maintenance

Paul Bussey, Senior Technical Consultant, AHMM

Olga Katsanova, Head of Technical Marketing, Services and Software, HILTI