img(height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=2939831959404383&ev=PageView&noscript=1")

Sports Hall and Swimming Pool Project, Wimbledon

New-build and remodelled existing buildings consolidate the school’s sports facilities

Sports Hall and Swimming Pool Project.
Sports Hall and Swimming Pool Project. Credit: Morley Von Sternberg

RIBA London Regional Award winner 2021


David Morley Architects for King’s College School Wimbledon
Contract value: undisclosed 
GIA: 3,545m2

The new centre, comprising new-build and remodelled existing buildings, consolidates the school’s sports facilities. A quiet perimeter facade, single access route and sculptured green roof sensitively respond to neighbouring listed properties. A new double-sided lift and colonnaded lobby link the new building to existing squash courts, forming a single holistic complex. Three linked pavilions contain a six-court sports hall, 25m swimming pool, reception, changing rooms, viewing galleries, gym and an exercise studio. The arrangement frames the Lodge Garden, creating a hierarchy of outdoor spaces and enriching the school grounds.

  • Sports Hall and Swimming Pool Project.
    Sports Hall and Swimming Pool Project. Credit: Morley Von Sternberg
  • Sports Hall and Swimming Pool Project.
    Sports Hall and Swimming Pool Project. Credit: Morley Von Sternberg
  • Sports Hall and Swimming Pool Project.
    Sports Hall and Swimming Pool Project. Credit: Morley Von Sternberg
  • Sports Hall and Swimming Pool Project.
    Sports Hall and Swimming Pool Project. Credit: Morley Von Sternberg
1234

Latest articles

PiP webinar: Architecture for Schools and Education Buildings

  1. Products

PiP webinar: Architecture for Schools and Education Buildings