img(height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=2939831959404383&ev=PageView&noscript=1")

A Church for the people

Sometimes when re-roofing older properties with shallow rafters and an existing ceiling below, there is simply no room to put insulation between the rafters, and St. Mary’s Church in Walkley, Sheffield presented just such a problem

In association with

St. Mary’s Church is a solid Victorian church with a deceptively spacious interior that has earned it the local name of the Tardis. There are exposed rafters both in the nave and the aisles, with a plasterboard ceiling between. Above the rafters, however, was the original lath and plaster ceiling, with the roof consisting of Welsh Blue slates.

Thanks to a Heritage Lottery grant it became possible to re-roof the church, but, in removing the tile battens, the original lath and plaster inevitably came away. This meant that although it was now possible to include insulation between the rafters, the depth was limited to 40mm by the presence of the plasterboard ceiling underneath.

TLX Gold proved the ideal solution here, requiring no more labour costs than for a conventional breather membrane. Once the roof was stripped, it was installed taut over the rafters and then counter-battened, then the tiles and tile battens were replaced. Because the product is 33mm thick, the lower part expands down into the rafter space leaving an unventilated air gap below. The shiny undersurface of the TLX Gold reflects back radiant heat across this gap, improving the U-value from an uninsulated 3.6 W/m2K to 0.67 W/m2K.

All parts of are fully breathable, from the top layer of high tensile UV25 Breather membrane, the internal polyester layers and even the bottom shiny gold layer, so there is no condensation risk. And given the heating costs of a building of this size, being able to insulate as well as re-roof was a big plus.

For more information visit www.tlxgold.co.uk

 

1234

Latest

Berlin architects Gustav Düsing and Max Hacke see their project for the Technical University at Braunschweig take the prize for viable, sustainable and cultural design

Sustainable project for the Technical University at Braunschweig takes coveted prize

The outward-facing, sustainable, timber Gabriel García Márquez Library in Barcelona gives Madrid-based SUMA Arquitectura the prize with its transformative community impact

Gabriel García Márquez Library rethinks the typology

Learn more about nurturing practice-client relationships and turning the short-term into the long-term

Learn more about nurturing practice-client relationships and turning the short-term into the long-term

How are the pressures and unpredictability of practice affecting the business model in architecture? Is the quest for the perfect design undermining project viability? As part of RIBA Horizons 2034, Tim Bailey of XSite reflects on the business challenges ahead

Tim Bailey offers some radical alternatives to current ways of working

Scotland’s New Build Heat Standard sets the pace for zero carbon heating adoption in the UK, but what does it mean for designers and will plans for dedicated Passivhaus legislation leave the rest of us playing catch up? Stephen Cousins reports

What does Scotland’s New Build Heat Standard mean for designers and the rest of the UK?