img(height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=2939831959404383&ev=PageView&noscript=1")

New generation of powerful wood adhesives

Fast-bonding Bona Titan is suitable for all types of wood flooring

In association with
Bona Titan specified to bond wide oak boards to metal subfloor.
Bona Titan specified to bond wide oak boards to metal subfloor.

Bona, the wood floor expert, has launched Bona Titan, a new supreme performance, silane-based adhesive for high value projects, very wide or oversized solid wood boards – or any installation where the quality of the bond has to be guaranteed.

Bona Titan contains Titanium Technology, a revolutionary new formula comprising quadruple crosslinking that delivers superior durability and an unbeatable initial bond speed – even under challenging subfloor conditions.

Bona Titan can be specified with confidence to bond all types of wood flooring. Its superb shear strength makes installation easy and keeps even the largest, solid boards securely in place. If the subfloor is sound and dry, no primer is required.

The hard, silane-based formula contains no ingredients that can migrate after curing, which eliminates all risk of discolouration at the joints. The smooth, thick consistency makes it easy to use and produces stable ribs, an extremely high initial grab and zero risk of hollow spots. The bond strength of Bona Titan will not diminish over time so the stability of the floor is guaranteed for the long term.

Bona Titan meets ISO 17178 standards and, in line with Bona’s environmental strategy, is a safe, clean formulation which also carries EC1-R Plus, DIBt, Greenguard and A+ low emission certifications.  

Bona Titan is compatible with underfloor heating and can be used directly on metal or tiles. Floors bonded with Bona Titan can be sanded after just 12 hours. 

  • Bona Titan silane-based adhesive for wood floors.
    Bona Titan silane-based adhesive for wood floors.
1

For more information and technical support visit bona.com or call Bona’s technical department on 01908 525 161.

Contact

info.uk@bona.com

O1908 525 150


 

Latest

Great architects deeply understood, and responded to, their context. We should talk the language of now, but never let the status quo limit us, argues Muyiwa Oki

We should talk the language of now, but never let the status quo limit us, argues Muyiwa Oki

In Blackheath, south London, Francisco Sutherland Architects replaced a failing 1980s glazed linkway with a barrel-vaulted space that offers glimpses of newly landscaped courtyards

Francisco Sutherland Architects replaced a 1980s glazed linkway with a barrel-vaulted space that offers glimpses of landscaped courtyards

Propose an installation that 'transcends utility' for a square in Bridgetown, reimagine the civic centre of an historic market town, bid for a spot on a construction consultancy services framework - some of the latest architecture competitions and contracts from across the industry

Latest: Caribbean pavilion contest

In the Portuguese capital, Metro Urbe's Museu de Arte Contemporânea Armando Martins deftly weaves together history, culture and hospitality into a harmonious narrative

Metro Urbe's Museu de Arte Contemporânea Armando Martins deftly weaves together culture and hospitality

At O’Donnell + Tuomey's densely programmed dance studio and performance venue in Stratford, east London the acoustic design goes unnoticed - just as intended

Just as intended, the acoustic design goes unnoticed at O’Donnell + Tuomey's Stratford dance studio and performance venue