Laidlaw Library features dramatic timber ceiling

ADP Architects has specified an eight-hundred square metre wooden grill ceiling, manufactured by Hunter Douglas, at the University of Leeds

In association with
Laidlaw Library at the University of Leeds features a timber Hunter Douglas ceiling
Laidlaw Library at the University of Leeds features a timber Hunter Douglas ceiling

The new £16.1 million Laidlaw Library at the University of Leeds has been enhanced by an 800m2 wood grill ceiling, designed and manufactured by Hunter Douglas.

The new ceiling, which has been specified by the project's architects ADP, comprises a pre-assembled grill of five slats each measuring 20mm x 55mm, which were threaded on to black dowels to maintain their structural integrity. ADP wanted an industrial-style finish, so no acoustic materials were used to fill the 55mm gaps between the slats.

African Ayous was specified, which was stained white RAL 9010 with water-based paint in the Hunter Douglas factory in the Netherlands, before being transported to the UK for installation. The wood also has Flame Delay fire retardant impregnation to achieve Euro Class B-S2-D0 fire resistance.

  • Laidlaw Library at the University of Leeds designed by ADP Architects features a timber Hunter Douglas ceiling
    Laidlaw Library at the University of Leeds designed by ADP Architects features a timber Hunter Douglas ceiling
  • Laidlaw Library at the University of Leeds designed by ADP Architects features a timber Hunter Douglas ceiling
    Laidlaw Library at the University of Leeds designed by ADP Architects features a timber Hunter Douglas ceiling
12

For more information and technical support visit www.hunterdouglas.co.uk.

 

Contact

01604 766251

info@hunterdouglas.co.uk


 

Latest

We need to reduce heat consumption in homes, and robotic installation of insulation is just one of the tools we can use to do so

New ways to reduce home heat consumption

The RIBA and the ARB codes of conduct require architects to record the terms of their appointment before working with a client. Getting this key document right is critical

RIBA CPD video: Forms of appointment

Hopkins Architects’ second school music building was a tall order, literally: to achieve the volume necessary for a natural acoustic space, the only way to go was up

Achieving the right acoustics meant the only way was up

Fewer buyers (and sellers) will drive a shift in tenures and types of housing. Could it be a new opportunity for architects?

A new opportunity for architects?

The Centre for Alternative Technology has taught environmentally aware design for decades. What do  architecture students gain?

CAT fills in for lip service to sustainability